Home > Video > Our Projects Gallery & Video > CSD Working | Rizhao Port Project

CSD Working | Rizhao Port Project

  • Category: Our Projects Gallery & Video
  • Browse number: 103
  • Release time: 2026-02-27 13:51:13

Detailed Description

Witness the sheer power of our 3500m³/h CSD at the Rizhao Port Dredging project. Running 20 hours a day with three non-stop shifts, this machine is a true heavy lifter. It is currently achieving a daily production close to 70,000 cubic meters, even while maintaining a discharge distance of nearly 5 kilometers. This performance proves our CSD's capability to handle large-scale infrastructure projects with unmatched efficiency and power.


Key Performance Highlights:

 Impressive Output: Achieving a daily production volume approaching 70,000 cubic meters. Long-Range Discharge: Successfully pumping dredged material over a distance close to 5 kilometers. Operational Endurance: Proven reliability with continuous operation across three rotating shifts (20h/day).

project-owner-survey.jpgpipe-line-csd.jpg

logo

Connect With Us
Other Useful Links

Copyright © Zhenjiang Yanyang Engineering Co., Ltd.  sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject