Class: CCS Domestic
LOA: 40.25m
Breadth: 12m
Depth: 6m
Crew:10
Empty draft: 3.758m
Full load draft: 4.300m
Full load displacement:1118.8t
Empty displacement: 789.4t
Navigation : coastal
Windlass: YMB28-2-45
Gross T:709t
Net T: 212t
M/E: Weichai 8WH25LC3000-9, 2207Kw x 2, 900RPM
WP10CD200E200, 182Kw x 2
(https://en.weichai.com/)
Propeller: Z-type propeller, nanjing china
Dia:2650mm
Generator: IFC2 283-4SB43, 150KWX2, 1500r/min
Bollard Pull 75 T
FIFI-1
1. Forward Winch (Combined Anchor & Towing Winch) Type: Hydraulic Combined Anchor & Towing Winch (Anchor/Warping Winch) Location: Forecastle Deck Configuration: Equipped with anchor chain wheels and warping drums. Performance: Brake Holding Force: ≥1500 kN Towing Capability: Capable of astern towing (backwards) via the anchor winch. Chain/Rope: Anchor Chain: φ28mm, AM2 Grade Rope Capacity: φ80mm × 200m (Synthetic rope) Control: Local control and Bridge remote control
2. Aft Winch (Main Towing Winch) Type: Horizontal Hydraulic Single Drum Towing Winch Location: Aft Deck Performance (Corrected): Rated Pull: ≥800 kN @ 8 m/min (Low Speed / Heavy Load) Rated Pull: ≥300 kN @ 22 m/min (High Speed / Light Load) Brake Holding Force: ≥1700 kN Rope Capacity: Wire Rope: φ54mm × 620m (Steel wire rope) Control: Local control and Bridge remote control
3. Stern Roller Type: Stern Roller (Towing Pin) Quantity: 1 Set Location: Stern Transom (Tail end plate) Function: Acts as a fairlead for the towing wire to reduce friction and allow angular movement during towing operations



Offshore & coastal heavy towing
Large vessel escort & berthing assistance
Port & terminal maneuvering
Marine emergency fire fighting (FIFI‑1)
Salvage & rescue operations
Offshore engineering support
Ultra‑strong bollard pull: 75 tonnes for heavy‑duty operations
6000PS high‑power twin main engines, speed ≥13 knots
360° full‑rotary Z‑drive for excellent maneuverability
CCS certified FIFI‑1 fire fighting system with dual fire monitors
Offshore class & stability for rough sea conditions
Spacious accommodation for 10 crew, comfortable long‑term operation
Full navigation & safety equipment ready for offshore missions
Reliable Weichai power with low maintenance cost
Strong hull & heavy‑duty fendering for port operations

Copyright © Zhenjiang Yanyang Engineering Co., Ltd. sitemap
This website uses cookies to ensure you get the best experience on our website.