product
Home > Vessels For Sale > Split Hopper Barge > 2300m³ Split Hopper Barge

    2300m³ Split Hopper Barge

    2300m³ Split Hopper Barge is a robust, cost-efficient vessel engineered for transporting dredged materials including sand, silt, and gravel across coastal and inland waterways. Featuring a hydraulic split-hull design, it enables fast, automated dumping without additional equipment, boosting operational efficiency significantly. With a reinforced steel structure she can load stones , making it a reliable choice for global dredging and marine construction contractors.
    Category:2300m³ Split Hopper Barge     Browse number:617     Release time:2026-01-23 10:02:06
  • Share:
  • Contact us Inquiry
  • WhatsApp:15952900547


2300m³ Self-Propelled Split Hopper Barge 
Built: Nov year 2022

Basic Information

Vessel Type: Self-propelled split hopper bargeHull Material: SteelNavigation Area: Coastal waters of China  Class: ZCDesign Rules: Domestic Sea-going Vessels Rules 2020/2021Crew: 10 persons

Principal Dimensions

Length Overall (LOA): 73.80 mLength Between Perpendiculars (LBP): 71.00 mDesign Waterline Length: 73.00 mMolded Breadth: 15.30 mMolded Depth: 5.60 mDesign Draft: 4.60 mBlock Coefficient: 0.8805Full Load Displacement: 4526.3 tDeadweight: 3590 tHopper Capacity: 2300 m³Gross Tonnage: 1999Net Tonnage: 1119


Performance

Service Speed: 10.0 knotsPropulsion: Twin engines, twin propellers, twin ruddersDischarging Type: Split hull by Hydraulic CylindersHydraulic Cylinder Thrust: 4.6 tons per cylinder


Equipment Summary

  • FAnchors: 2 × 1900 kg Speke anchors

  • Anchor Chain: Φ38 mm, CCS Grade 3, total length 440 m

  • Windlass: 2 sets electric-hydraulic windlass

  • Steering Gear: 2 sets hydraulic steering gear (50 kN·m)

  • Rudder: 2 sets balanced rudder, area 4.86 m² per rudder


Application

This self-propelled split hopper barge is used for mud transportation, dredge material carrying, and split-hull dumping at designated offshore areas. It mainly supports capital Dredging, port construction, waterway maintenance, and Reclamation projects.



How we build the 2300m3 Split Hopper Barge :


134496862878965671.jpg218576813902099832.jpg206448513574121001.jpg16131963514523050.jpg
165816469183764612.jpg353209686170130205.jpg482141656985558180.jpg562237807503833763.jpg718441606067393721.jpg801400736761307287.jpg884309916119019056.jpg16131963514523050.jpg



FAQs

Q: Where is the vessel delivered, and who bears the freight costs?

A: The delivery location is usually the port or anchorage designated by the seller (e.g., a port in China, under FCAS terms). In accordance with international practice, unless otherwise agreed, the buyer is responsible for all costs related to transportation, insurance, and other expenses incurred after the vessel's delivery.


We can recommend partner shipping service providers and assist with various formalities.


Q: Do you provide after-sales warranty?

A: International transactions for second-hand vessels are sold on an "As-is, Where-is" basis, and the price does not include warranty or after-sales service.


However, we will assist the buyer in handing over necessary documentation (such as original manuals and maintenance records). 

If you require a warranty or after-sales support from us, this can be arranged under a separate contract. We have extensive experience and can guarantee the smooth operation of the vessel throughout its lifecycle.


  • Previous page: None
  • Next page: None

ONLINE MESSAGE

Please fill in a valid email address
Recommended Products

logo

Connect With Us
Other Useful Links

Copyright © Zhenjiang Yanyang Engineering Co., Ltd.  sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject