120m Piling Barge
Type: Piling Barge / Offshore Piling Engineering Vessel
LOA: 59.80m | Length: 65.80m
Breadth: 28.20m | Depth: 4.60m
Draft: 2.70m
GT: 2496 | Crew: 19 persons
Built: 2010 | Class valid to: 2030
Navigation: Coastal & Inshore
Piling frame height above deck: 120m
Rest frame height: 23.6m
Folding frame height: 48m
Piling frame type: External leader
Leader size: 93m × 1.1m
Tilt angle: 0–18.5°
Piling frame weight: 460t
Max lifting capacity: 360t
Max pile weight: 200t
Max pile diameter: 3.8m
Max pile length: 96m + water depth
Lifting point above deck: 97m
Hammer point above deck: 107m
Hammer center to leader: 1.14m
Leader to bow: 6m
Piling hammer: Hydraulic hammer HHP50 (max 800kJ)
Hammer winch: 350t ×15m ×2
Main hook winch: 350t ×30m ×2
Aux hook winch: 350t ×30m ×2
Moving winch: 250t×9m×4; 180t×9m×4
Elevator winch: 20t×18m×2
Utility winch: 80t×25m×2; 100t×25m×1
Main engines: 2 × 8170ZCA, 441kW each
Generators: 2 × 400kW + 1 × 64kW
Power system: AC 400V, 3‑phase insulated
Applications
Offshore Wind farm pile foundation installation
Coastal port & wharf piling construction
Bridge pier & marine foundation engineering
Offshore platform & terminal piling works
Inshore & coastal foundation reinforcement
Advantages
Ultra‑high 120m pile frame for long piles up to 96m
Strong piling capacity: max pile weight 200t, max lifting 360t
Stable hull & wide beam for safe offshore operation
Full‑set winch system for precise pile positioning
Valid class certificate, ready for coastal & inshore work
Well‑maintained machinery & good working condition
High efficiency & flexible operation
FAQs:
Q1: What types of projects this Pile Driving Barge suitable for?
A: It is mainly applicable to three core engineering fields:
① Offshore wind power foundation construction (driving foundation piles for offshore wind turbines);
② Port and wharf construction (piling for wharf berths, breakwaters, and port shore protection structures);
③ Inland river and coastal bridge infrastructure (driving foundation piles for bridge piers and approach bridges).
It can adapt to both coastal and inland river shallow-Water Construction scenarios.
Q2: What after-sales support services are provided for the Pile Driving vessle?
A: We offer a full-cycle after-sales support package, including:
① Spare Parts supply: Providing a 1-year free spare parts warranty (covering core components like piling hammers and lifting systems) and establishing a global spare parts supply network for urgent replenishment;
② Technical maintenance: Dispatching professional engineers for on-site maintenance and fault diagnosis after receiving a service request;
③ Long-term technical consultation: Offering permanent online technical guidance for daily operation, maintenance, and piling parameter optimization of the vessel.

Copyright © Zhenjiang Yanyang Engineering Co., Ltd. sitemap
This website uses cookies to ensure you get the best experience on our website.